Underfloor Extraction
In this configuration perspex underground pipe work, floor plates and sump plates are supplied to your builder who install under our supervision to our supplied builders details. On completion our engineers install the above ground extraction fan, roof penetration and make up the hose assemblies.

The crush resistant extraction hose lies within the ground pipe and box (shown aboveground) leaving the whole floor area free when not in use. When the extraction nozzle is required the lid is lifted and rotated and the hose and nozzle withdrawn as required. This can then be used when the car is on the floor or in an elevated lifted position.
The top plates can be utilised around a tiled floor workshop or set in a concrete slab as required
Hose Stowage system with floor plate.

